PERFO
Tailings Pond of Dahutang North Tungsten Mine, Wuning, Jiangxi
The dam of tailings pond is constructed by means of filling against the center line. Maximum heigh of dam: l98m.
Final effective storage: about l88,700,000m³.
The dam of tailings pond is constructed by means of filling against the center line. Maximum heigh of dam: l98m.
Final effective storage: about l88,700,000m³.